Files and workflow handoffs

Move Estimate Data with Reviewed Files

Use a defined CSV template to bring line items into Bidlark, review costs and scope, then export estimate data or a customer proposal.

The workflows below use files you upload or download. Native connections to accounting, CAD, project management, or cloud storage products are not currently offered on this page. Confirm any specific connection with our team before making it part of your process.

Test a File Workflow

Supported estimate file workflows

Import line items with a CSV template

Download the line-item template from your BOM. It includes part number, description, manufacturer, vendor, subdivision, quantity, unit cost, labor, notes, and below-the-line status.

Check before use: Review the import preview, errors, and warnings. Keep per-unit labor hours distinct from total line hours. For an update export, preserve the line-item IDs so existing rows can be matched.

Export an estimate for review

Export BOM data as CSV, or use the line-item update export to work on rows outside Bidlark and import the edited template.

Check before use: The update template is a specific import format. A general BOM export or another application’s CSV may need manual column mapping. Confirm quantities and extended labor before applying changes.

Prepare a customer proposal

Review scope, exclusions, quantities, and pricing before generating a proposal PDF. Keep the customer-facing proposal separate from internal cost worksheets.

Check before use: Inspect the actual exported document, including scope responsibility and the offered total. Resolve pending review items before sharing a final proposal.

Working with drawings and other tools

Bluebeam Revu and measurement exports

Bluebeam documents CSV, XML, and PDF markup summaries. Bidlark’s line-item import uses its own CSV template. If you start from a measurement export, manually map the relevant fields, preserve units in your review, and check the preview. Direct import of an arbitrary Revu export has not been validated here.

CAD drawings and PDF source documents

For a drawing-based evaluation, bring issued PDF sheets and the relevant specifications. Drawing takeoff requires enabled account access. Ask which documents and trade workflow are supported for your sample. Native DWG or RVT model import is not a verified Bidlark workflow.

Accounting and project management

Before moving an estimate into another system, confirm its required fields, supported import format, tax treatment, and whether you need costs or selling prices. Bidlark’s CSV export alone does not establish compatibility or two-way synchronization with that system.

Validate one small file before a full project

  1. Use a permitted sample with a material row, a labor entry, and an alternate or excluded item.
  2. Confirm field mapping, quantity units, per-unit versus total labor, and how existing rows are identified.
  3. Compare the imported values and exported totals with your source worksheet. Check scope and exclusions separately.
  4. Record the product version, template, and review steps your team will use for future transfers.

For the wider tool-selection process, read our construction estimating software evaluation checklist.

Show us the handoff you need

Describe the source tool, the destination, and the fields that must survive the transfer. We can review the requirement and demonstrate currently supported steps.

Request a Demo